石材(cai)結晶(jing)施工(gong)操作流(liu)程
1、施工程序:石材地(di)(di)面(mian)(mian)完成(cheng)面(mian)(mian)清(qing)理(li)→地(di)(di)面(mian)(mian)干燥(zao)處理(li)→地(di)(di)面(mian)(mian)結晶處理(li)(K2、K3藥(yao)水(shui))→整體(ti)地(di)(di)面(mian)(mian)養護處理(li)(K1藥(yao)水(shui))→地(di)(di)面(mian)(mian)清(qing)理(li)養護。
2、石(shi)(shi)(shi)材地(di)面(mian)完(wan)成面(mian)清(qing)理(li):進行石(shi)(shi)(shi)材地(di)面(mian)結晶處(chu)理(li)之(zhi)前,鋪貼完(wan)成面(mian)整(zheng)體平整(zheng),無色(se)差,每(mei)塊石(shi)(shi)(shi)材之(zhi)間對(dui)角(jiao)平齊,地(di)面(mian)進行整(zheng)體的(de)清(qing)理(li),用干(gan)燥清(qing)潔的(de)地(di)拖清(qing)理(li)干(gan)凈,地(di)面(mian)無沙粒、雜質。
3、整體(ti)地(di)面(mian)(mian)養護(hu)處理:如果是空(kong)隙度大(da)的(de)石材(砂(sha)巖(yan)、洞石等)要進行大(da)理石防護(hu)劑涂刷,12小時后,再用洗地(di)機在(zai)地(di)面(mian)(mian)進行交替完(wan)成K2、K3藥水轉磨(mo),即K2-K3-K2-K3-K2共五遍,再換上(shang)白色拋光墊,噴上(shang)少(shao)量的(de)K1藥水,重新拋磨(mo)一次,以此增加整個地(di)面(mian)(mian)的(de)晶(jing)面(mian)(mian)硬(ying)度。
4、地面(mian)(mian)清理養護(hu):當石材表面(mian)(mian)結成晶體鏡面(mian)(mian)后,使(shi)(shi)用(yong)吸(xi)(xi)水機吸(xi)(xi)掉地面(mian)(mian)的殘(can)留物,水分,使(shi)(shi)用(yong)拋(pao)光墊(dian)拋(pao)光,使(shi)(shi)整個地面(mian)(mian)完全干(gan)燥,光亮(liang)如鏡,如果局(ju)部損壞可以(yi)進行局(ju)部保養,施工完成可以(yi)隨(sui)時上去(qu)行走(zou)。 |